Terry's sign
 
 213 746 7445  California
 
 Extension = ask for Billy
 
 Email = support@megasign.inc
 
Invoice number = 38867

Weird problem -> coin image did not have dimensions he added .....but he also said it was the ATM image the previous day if I remember correctly.

 -----------------------------
 
 DW Dickie Concrete - (330) 424-1922
 
 Waste block
 
   -East Liverpool takes the order
   -Lisbon has the delivery vehicle with placement 
   -75 per block + 250 per load for delivery of 10
   -Dims 2x2x6
   -175 blocks back ordered
   -Still is concrete waste that is used so psuedo random when they would deliver
   -weight of 2x2x6 waste block ->
   
Recalc the cost of the straight section

8/4/2021 - was informed from Lisbon location they only place the 2x2x3ft blocks and that they cost 75 each also which breaks the cost model.
-> call and talk with different person to verify ->

8/4/2021 -> Cost per cubic yard concrete -> 136 per
         -> Maximum concrete truck load volume -> 10yd
         -> cost of full truck of concrete -> 1360 +20 fuel
         -> Deliver gravel? -> Lisbon is not equipped. 
		 -> Gravel cost? -> 30 per ton 


gravel density = ~ 105 lb/ft3 
Volume(1 ton gravel) = 19 ft^3