I ran across an interesting paper while searching for other things: http://www.cmu.edu/all/Lecture711.pdf

The interesting observation I made was in the diagram.  A very large percentage of electrical energy is lost in the transmission.  This suggests that when a viable on site generation method is finally found that its implementation will most likely run like wildfire due to the double savings.

 

 

 

 

Categories:

1 Comment

» First Solar Inc. May be the First Viable Solar Venture · March 9, 2007 at 12:01 am

[…] There is alot suggesting this is the beginning of some real fun in the distributed energy production field.   Since 1/2 of the electrical energy is wasted in transit to its consumer there is a double gain when energy production is colocated with the consumer thereof.  […]

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *